Skip to systems
MEPVirtual · Engineering Knowledge Hub
DESIGN. CALCULATE. VERIFY. COMPLY.REFERENCE REGIONS · DUBAI · DEWA ·

YOUR INTERACTIVE MEP ENGINEERING WORKSPACE

Explore MEP systems.
Learn by doing.

Free virtual labs and engineering calculators for electrical (LV, MV and HV), HVAC, fire alarm and ELV systems. Explore HV and MV substations, switchgear checks, cable containment, FAHU operation, earthing, solar PV and more. Work through real engineering scenarios, inspect results and learn how systems behave.

Ask Engineer Copilot

Find a lab, explore a site problem or check a calculation.

Open Copilot →

MEPVirtual at a glance

Tap a number to see what is behind it.

Worked engineering guides

All 127 modules

Every lab on the site, grouped by discipline. Open a group or type to filter.

Electrical LV & power37 labs
HV · High voltage17 labs
MV · Medium voltage17 labs
ELV, BMS & security10 labs
Fire & life safety6 labs
HVAC & mechanical13 labs
Plumbing, drainage & gas7 labs
Cross-trade & project8 labs
Site engineering8 labs
Design engineering4 labs

Continue exploring

Explore how the systems connect.

Select a service. Follow its path. Open a related lab.

Electrical distribution

Follow the supply from the main switchboard to the riser and each floor.

    Choose a component in the diagram to inspect it.

    Conceptual views for learning. Not a coordinated engineering model.

    Choose your learning path

    Learn from site problems

    The calculation was correct.
    What failed on site?

    Explore the cause, practical checks and lessons from installation faults.

    Browse site cases →

    Knowledge Hub

    Explore practical Q&A, explanations and engineering insights.

    Browse Q&A →
    GO FURTHER

    Built to explore. Open to everyone.

    Get to know the platform, find your next lab or help shape what comes next.

    SITE CASE OF THE WEEK

    One real site problem, every week

    A short email with one fault from a real project: what went wrong, why, and how it was fixed. Drawn from the MEPVirtual library of 415 site cases. Free, and you can leave at any time.

    We only use your email to send the weekly case. See privacy.

    EXPLORE THE SYSTEM

    MEPVIRTUAL ON YOUR DEVICE

    Install as a PWA app

    Open MEPVirtual from your home screen or desktop. Installation options depend on your browser.

    iPhone or iPad · Safari

    Open the Share menu, choose Add to Home Screen, then tap Add.

    Android · Chrome

    Open the browser menu and choose Install app or Add to Home screen.

    Desktop · Chrome or Edge

    Use the install icon in the address bar or the browser menu’s app installation option.

    Visit online first. Previously visited tools may remain available offline; live data, external resources and forms still need an internet connection.

    THE STORY

    About MEP Virtual

    MEP Virtual is a practical learning and engineering reference platform built from over 20 years of experience in building and infrastructure projects.

    Engineering is more than calculations and drawings. It is about understanding how systems work, why design decisions are made, and how those decisions affect performance, safety, and maintainability. MEP Virtual was created to make that knowledge easier to access and apply.

    Through interactive tools, technical guides, and design labs, the platform helps engineers, technicians, students, and project professionals explore MEP systems, compare design options, understand installation practices, and gain confidence in testing and commissioning processes.

    The content and tools provided are intended for educational and reference purposes. Users should always verify information against project specifications, applicable standards, manufacturer recommendations, and local authority requirements. Final engineering decisions should be reviewed and approved by qualified professionals responsible for the project.

    Our goal is simple: to make engineering knowledge practical, accessible, and useful for the people who design, build, and maintain the built environment.

    EXPLORE BY TASK

    Find the right lab

    What would you like to work on?

    Choose a task to see suggested labs.
    YOUR INPUT MATTERS

    Help improve the labs

    Found an error or have an idea for a new module? Include the lab name, what happened and the result you expected.

    MODULE GUIDE

    Module

    MEP VirtualModuleTools & topics

    What you can explore

    Open this module ↗
    MEP VIRTUAL · SYSTEM MAP

    Explore every module

    Select a discipline, then expand a lab to see its tools and topics. Use the cover-page system panels to browse dedicated electrical, ELV, HVAC, plumbing and drainage labs.

    Privacy & site information

    You can allow or decline Google Analytics through Privacy settings. Feedback is submitted through Netlify Forms. Advertising may be served by Google AdSense. Read the full privacy information.